25,336 Happy Customers

24/7 Freephone Support

300+ Engineers Nationwide

Call Free: 0808 231 1956

B80FS Floor Standing Boiler

B80FS Floor Standing Boiler

The JLA B80FS floor standing boiler offers reliability and energy efficiency in one compact package. One of the smallest models on the market, it can fit through standard doors and has wheels for ease of movement, making it a great option for small- to medium-sized businesses where higher output is needed, but space is at a premium.
 


How businesses like yours rate JLA…




Floor Standing Boilers

This is content shared for all floor standing boilers
Features
  • Gross operational efficiency of up to 98%
  • Modulation range of 1:5
  • Remote two-way data access for fast diagnosis of faults
Ideal For
  • Care Homes

  • Education

  • Food Production

  • Hairdressers & Salons

  • Health Clubs & Spas

  • Holiday Parks

  • Hotels

  • Housing

  • Public Sector

  • Pubs

  • Restaurants

  • Sport

  • Vets

Specifications
Water Pressure (bar): 6 kW Output: 80
Fuel Type Options: Gas Heat Exchanger Material: Stainless Steel
Remote Monitoring: Included Controller: Standard Included
Modulation Range: 1:5 ERP Rating: A Class
Constant Temperature: Included Gas Connection - R: 1
Total Weight (kg): 238 NOx Credit Rating: 4 ( < 40mg/kWh)
Cascade Options: N/A Overall dimensions (mm) (HxWxD) without flue connection: 1459x680x680

Market leading equipment with Total Care

  • UK's number 1 commercial equipment supplier
  • One simple monthly payment - no upfront cost
  • Fast breakdown Response - 24/7, 365 days a year

Get a Quote

Find out how we use your personal data

Other products you may also like

6-Burner Premium Gas Range

  • 5.3 kW burners
  • Five shelf positions as standard
  • Two shelves supplied as standard

JLA 98

  • Versatile and efficient
  • Eco options for greater cost savings
  • Stackable with JLA dryers

Ultra Bio Washing Powder

  • Tough on stains
  • Safe for all fabrics
  • Easily-dispensed powder

WSC250IL Water Cylinder

  • 250-litre capacity
  • Insulation exceeds CHESS best practice
  • Simple installation - no sacrificial anode required